Draft letter for campaign to obtain support for obtaining a priority scheduling of the Lake Jackson TMDL (Total Maximum Daily Load.) There is an opportunity to have the Lake Jackson TMDL placed on the 2019 schedule. In order to do this they will need a lot of indication that there is public support.
Feel free to use this letter as your own, or edit it to reflect the language and support you wish to express.
Leave a Reply